Structural Steel Completed

Overhead Conveyor Bridge, Mundra

Fabrication and erection of 600 MT overhead conveyor bridge structure including trusses, gantries, and walkways for Adani Group at Mundra, Gujarat.

600 MT
Total Steel
9 Months
Duration
Mundra
Location
2023–24
Year
Location
Mundra, Gujarat
Total Tonnage
600 Metric Tonnes
Duration
Jun 2023 – Feb 2024
Client
Adani Group
Project Overview

About This Project

GM Engineering & Project was awarded the structural steel package for an overhead conveyor bridge at Adani Group's facility in Mundra, Gujarat. The scope covered fabrication and erection of 600 MT of structural steel including trusses, gantries, walkways, and supporting structures for the conveyor system.

The project required erection of long-span bridge segments at height while maintaining precise alignment and structural stability "” all within an active plant environment. Our team coordinated closely with Adani's mechanical and electrical teams to ensure seamless integration with the conveyor system installation.

The project was completed within the scheduled timeline from June 2023 to February 2024, achieving precise structural alignment and zero major safety incidents throughout execution.

Scope of Work

What We Delivered

Conveyor Bridge Fabrication
Fabrication of all structural steel components for the overhead conveyor bridge to Adani specifications
Overhead Supporting Structures
Erection of overhead conveyor supporting structures at height using advanced lifting techniques
Trusses, Gantries & Walkways
Installation of trusses, gantries, and access walkways along the full bridge span
Alignment & Bolting
Precision alignment and bolting of all bridge segments to engineering tolerances
Conveyor System Installation Support
Structural installation support for conveyor system integration and commissioning
Mechanical & Electrical Coordination
Continuous coordination with Adani's mechanical and electrical teams throughout execution
Engineering Challenges

Challenges & Solutions

Long-Span Erection at Height with Alignment Precision on an Active Site

Erecting long-span conveyor bridge segments at significant height while maintaining precise structural alignment "” all within a continuously operating plant environment "” presented major safety and engineering challenges.

Solution
  • Used advanced lifting and erection techniques suited for high-elevation work
  • Executed work in planned segments for better control and precision
  • Ensured precise alignment through skilled supervision at every stage
  • Maintained strict safety protocols for all work-at-height activities
Key Outcomes

Project Results

Successfully completed within scheduled timeline
Achieved precise alignment and structural stability
Zero major safety incidents during execution
Smooth integration with Adani's conveyor system
High client satisfaction with overall project delivery

Project Specifications

  • Location
    Mundra, Gujarat, India
  • Client
    Adani Group
  • Category
    Structural Steel
  • Total Tonnage
    600 Metric Tonnes
  • Duration
    June 2023 – February 2024
  • Safety Record
    Zero Major Incidents
  • Status
    Completed