Structural Steel Ongoing

Power Plant Steel Works, Dholera

Fabrication and erection of 1000 MT structural steel for RENEW Photovoltaics Private Limited's power plant facility at Dholera, Gujarat.

1000 MT
Total Steel
Ongoing
Status
Dholera
Location
2024
Started
Location
Dholera, Gujarat
Total Tonnage
1000 Metric Tonnes
Duration
Jan 2024 – Present
Client
RENEW Photovoltaics Pvt. Ltd.
Project Overview

About This Project

GM Engineering & Project is currently executing the structural steel package for RENEW Photovoltaics Private Limited at their power plant facility in Dholera, Gujarat. The scope covers fabrication and erection of 1000 MT of structural steel including primary structures, platforms, walkways, and staircases across the facility.

All fabrication is being carried out at our Hansalpur workshop under strict quality control, with erection progressing systematically on site. The project demands precise alignment and bolting of structural members to meet the client's engineering specifications, with continuous coordination between our site team and RENEW's project engineers.

The project commenced in January 2024 and is currently progressing on schedule, with strong safety performance maintained throughout execution.

Scope of Work

What We Are Delivering

Structural Steel Fabrication
Fabrication of all structural steel components to client drawings and specifications
Steel Structure Erection
Erection of steel structures for power plant facilities using proper lifting equipment
Platforms, Walkways & Staircases
Installation of access platforms, walkways, and staircases throughout the facility
Alignment & Bolting
Precision alignment and bolting of all structural members to engineering tolerances
Client & Site Engineering Coordination
Continuous coordination with RENEW's project and site engineering teams
Safety & Quality Compliance
Full compliance with client safety standards, quality plans, and project specifications
Engineering Challenges

Challenges & Solutions

Large-Scale Execution Within Tight Timelines on an Active Site

Executing 1000 MT of structural steel work while maintaining precision, safety standards, and schedule adherence on a live power plant construction site presented significant logistical and coordination challenges.

Solution
  • Planned a systematic erection sequence for smooth, conflict-free execution
  • Deployed skilled manpower with experienced site supervisors
  • Used proper lifting equipment for efficient and safe material handling
  • Ensured strict safety compliance with regular inspections and toolbox talks
Key Outcomes

Project Progress

Project execution progressing as per schedule
High-quality standards maintained throughout execution
Strong safety performance with zero major incidents
Effective coordination with RENEW client teams
On track for timely completion as per project milestones

Project Specifications

  • Location
    Dholera, Gujarat, India
  • Client
    RENEW Photovoltaics Private Limited
  • Category
    Structural Steel
  • Total Tonnage
    1000 Metric Tonnes
  • Duration
    January 2024 – Present
  • Safety Record
    Zero Major Incidents
  • Status
    Ongoing

Have a Similar Project?

Get in touch with our team for a free consultation and competitive quote.