Structural Steel Completed

Industrial Warehouse Structure, Ahmedabad

Fabrication and erection of 850 MT structural steel for a 50,000 sq ft industrial warehouse complex for Adani Logistics in Ahmedabad, Gujarat.

850 MT
Total Steel
6 Months
Duration
50,000 sq ft
Area
Ahmedabad
Location
Location
Ahmedabad, Gujarat
Total Tonnage
850 Metric Tonnes
Duration
Jan 2023 – Jun 2023
Client
Adani Logistics
Project Overview

About This Project

GM Engineering & Project was awarded the complete structural steel package for a large-scale industrial warehouse complex by Adani Logistics in Ahmedabad. The project involved fabrication and erection of 850 MT of structural steel covering a total built-up area of 50,000 sq ft.

The scope included primary structural frames, secondary steel members, roofing purlins, side wall girts, crane girders, mezzanine floors, and all associated bracings and connections. The structure was designed to accommodate heavy industrial loading requirements with overhead crane provisions.

The project was completed within 6 months from January to June 2023, meeting Adani Logistics' operational commissioning schedule with zero major safety incidents throughout the execution phase.

Scope of Work

What We Delivered

Primary Structural Frames
Fabrication and erection of main portal frames, columns, and rafters to design specifications
Secondary Steel Members
Roofing purlins, side wall girts, eave struts, and all secondary structural members
Crane Girders & Runway Beams
Heavy-duty crane girders and runway beams to support overhead material handling equipment
Mezzanine Floor Structure
Structural steel mezzanine floors with beams, columns, and chequered plate decking
Bracings & Connections
Wind bracings, roof bracings, and all bolted and welded connections per structural drawings
Surface Treatment & Painting
Shot blasting, primer application, and finish painting of all structural steel members
Engineering Challenges

Challenges & Solutions

Large-Scale Erection with Tight Commissioning Deadline

Erecting 850 MT of structural steel across a 50,000 sq ft footprint within 6 months required precise sequencing, heavy crane coordination, and parallel fabrication-erection workflows to meet Adani Logistics' operational deadline.

Solution
  • Ran fabrication and erection in parallel zones to maximise productivity
  • Deployed multiple crane teams with planned lift sequences to avoid clashes
  • Pre-assembled sub-frames at workshop to reduce on-site erection time
  • Maintained strict quality checks at each erection stage to avoid rework
Key Outcomes

Project Results

850 MT erected within 6-month schedule
50,000 sq ft warehouse structure completed on time
Zero major safety incidents during execution
Structure met all load-bearing and crane loading requirements
Timely handover enabling Adani Logistics to commission operations as planned

Project Specifications

  • Location
    Ahmedabad, Gujarat, India
  • Client
    Adani Logistics
  • Category
    Structural Steel
  • Total Tonnage
    850 Metric Tonnes
  • Built-up Area
    50,000 sq ft
  • Duration
    January 2023 – June 2023
  • Safety Record
    Zero Major Incidents
  • Status
    Completed

Have a similar project requirement?

Get a Quote
More Projects

Related Projects

Overhead Conveyor Bridge
Structural Steel

Overhead Conveyor Bridge

Mundra, Gujarat · 600 MT

View Case Study
Power Plant Steel Works
Industrial

Power Plant Steel Works

Dholera, Gujarat · 1,000 MT

View Case Study
Commercial Complex Metalwork
Architectural

Commercial Complex Metalwork

Ahmedabad, Gujarat · 300 MT

View Case Study